EVENT LOG FOR SITE RCS The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 11/06/2013 16:48 IanJezor The RCS site was reactivated on 10/23/2013. Ian 07/16/2013 13:39 Jezorek On 26 June 2013 the RCS site was shut down for the summer. Flow has become disconnected in the creek. The site will be restarted in the fall. Ian 02/07/2013 10:13 Jezorek On, 22 January 2013, Antenna 1 at RCS was re-established. It had been out of operation since flooding last spring. Ian 01/02/2013 00:00 PTOC_Bot Annual log file initiation for RCS #### End of Event Log for RCS ###