EVENT LOG FOR SITE MWC The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 10/24/2013 15:33 Will Water diversion ceased at MWC on October 4th. Data uploads from MWC ceased on October 23rd. 06/20/2013 15:26 Will Due to vandalism, the multiplexer at the headgate of Maxwell Canal (coils A1&A2) was not operating between June 14th 2013 15:00 and June 17th 2013 10:00. After this interruption, only coil A2 was operating. Due to a power outage, the multiplexer at the screen of Maxwell Canal (coils B1 & B2) was not operating between May 8th 2013 22:00 and May 9th 2013 8:26 04/26/2013 11:26 Will Due to vandalism and power issues, the multiplexer at the headgate of Maxwell Canal (coils A1&A2) operated only at the following times in 2013: April 1 13:40 - April 15 17:49 April 16 06:18 -17:30 & 17:48-17:58 April 17 06:23 - 17:43 April 18 06:42 - 17:40 April 19 08:53 - 09:00 & 10:10 - 17:30 April 20 06:37 - 18:00 April 21 06:30 - 17:30 The headgate array began continuously operating and scanning for tags on April 22nd 06:04. In summary, the headgate array operated 65% of the time within the 26 days between March 27 08:00 - April 22 08:00. 04/26/2013 09:25 Will Due to vandalism and power issues, the multiplexer at the headgate of Maxwell Canal (coils A1&A2) operated only at the following times in 2013: April 1 13:40 - April 15 17:49 April 16 06:18 -17:30 & 17:48-17:58 April 17 06:23 - 17:43 April 18 06:42 - 17:40 April 19 08:53 - 09:00 & 10:10 - 17:30 April 20 06:37 - 18:00 April 21 06:30 - 17:30 The headgate array began continuously operating and scanning for tags on April 22nd 06:04. In summary, the headgate array operated 65% of the time within the 26 days between March 27 08:00 - April 22 08:00. 04/24/2013 12:29 Will Diversion of water into Maxwell Canal began on the morning of March 27th 01/02/2013 00:00 PTOC_Bot Annual log file initiation for MWC #### End of Event Log for MWC ###