EVENT LOG FOR SITE LLR Most recent activity to be listed first. First line of each entry lists date, time and who is reporting. Subsequent lines of each entry aligned under Time column. Do not use tabs, only spaces. Date Time Who What ---------- ----- -------- ----------------------------------------------- 04/28/2010 07:14 Mike The LLR array was installed on 8/18/2009 and interrogation activity was initiated on that day at 9:20 PST. This site consists of a single antenna array that spans 50-ft of the 56-ft channel. There is a power line located just upstream of the array, which is emitting some interference noise. We are working with Biomark and Idaho Power to address the issue. Otherwise, site operations continued throughout 2009 with no interruptions in interrogation activity. 08/27/2009 13:49 Dave Initial log creation for the Lower Lemhi River. The site steward is Jeff Lutch, IDFG. The technical point of contact is Mike Biggs, IDFG. ####End of Event Log for LLR###