EVENT LOG FOR SITE JCJ The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 11/23/2009 10:18 Don_Warf DLW email test _____________________________________________ From: Don Warf Sent: Monday, November 23, 2009 9:26 AM To: 'pitevent@psmfc.org'; 'pitevent@ptagis.org' Subject: gra,grj,goj,rpj,lmj,ich,mcj,mc1,mc2,jdj,pro,esj,jcj,cfj,bcc,bo1,bo2,bo3,b2 j,rzf Email test 11/23/2009 09:39 Troy_Hum Email Test from Troy 05/27/2009 08:12 Scott_Li Turned off file submission checking for this site as they are down for the year. Also, disabled put (noping) statements in Hobbit. 05/21/2009 10:01 Dave I flagged pond operations as completed as of 5/18/09 in the ptagis3.obs_site_dates table. I was going to change site notification to 'ptoc_ken' only in etc/sites, but discovered it had been configured that way all season. 05/16/2009 08:51 Darren PSMFC was informed on Friday by Charlie Strom that all the fish were pushed out of the raceways. the process started in the morning at all three locations. The pumps are still running and there are some residual fish remaining in the creek. This fish will be removed sometime next week. 05/13/2009 10:01 scottl Update for work done on 5/12/09. Performed site GMC, all transceivers were tuned and calibrated as necessary, no problems to report. Site personnel indicate that the fish in all raceway's will be pushed out of this facility starting Thursday May 14th. 04/28/2009 14:52 scottl Performed site GMC's all transicevers were retuned and calibrated as necessary, no problems to report. CFJ: Replaced the Sat modem in order to correct the on and off line problems of recent past. Will monitor. 04/20/2009 14:37 Alan A GMC was performed 4/20/2009. All transceivers were checked and tuned as necessary. 15 sticks were thrown into each monitor. A2 read 14 of 15 sticks, all other transceivers read all sticks. The clocks on both PCs (PC1 ~15sec fast, PC2 ~2 min slow) were set to within one second of atomic time. No other problems found. 04/13/2009 08:38 Alan Via PCA on PC1 I deleted the zip file from the temp folder and manually uploaded JCJ09102.C1 - JCJ09103.C1. Minimon was bounced during this process. File JCJ09103.J2 was created on PC2 to fill the gap during PC1's downtime. 03/31/2009 09:10 Alan Minimon was exited on PC1 to delete the zip file that was causing upload issues. Files JCJ09089.E1 through JCJ09090.D1 were then manually pushed to PTAGIS. File JCJ09090.I2, manually submitted from PC2, covers the gap created during PC1's downtime. 03/16/2009 08:14 Darren According to Charlie Strom, the screens will be removed on Friday 3-20-09 for the start of the volitional release. PSMFC will verify on Friday that the screens have been removed. 03/05/2009 08:30 Scott_Li Enabled file submission checking now that the facility power has stabilized. 02/25/2009 14:50 darren@b A2:BadOscFreq: A2:BadOscFreq: Alarm was generated by PSMFC personnel during a site GMC. 02/25/2009 14:50 darren@b A2:BadOscFreq: Alarm was generated by PSMFC personnel during a site GMC. 02/19/2009 08:01 Scott_Li Per Charlie Strom, fish should be delivered to the site today, Feb 19th, 2009. 02/18/2009 16:09 Troy A pre-season site GMC was performed 02-19-2009. Both monitors were dug out, opened and the water was removed. The left enclosure had no water to speak of in it and the right had about 10". The fibers were shot and the Org from bundle one was found to be weak and the Red was broken. All spares for bundle two were good. The transceivers were tuned and the buffers erased. 10 stick were thrown and the results were as follows: A1 10 of 10 A2 10 of 10 B1 9 of 10 B2 10 of 10 Ice balls were needed to dislodge some of the sticks. Both Circuit Breakers were off when we arrived and one tripped while we were here. No other problems to report. 02/17/2009 13:12 Scott_Li Removed the noping statement for JCJ PC1 and 2 in the hobbit hosts file. Maintenance personnel while be on-site tomorrow for preseason activities. 02/12/2009 07:13 Darren_C This message was sent to PSMFC by Charlie Strom of the YN. We fired up Jack Creek on Monday and will let it run to see how things survived the winter. We are planning on moving fish to the site on Wednesday through Friday of next week. Have a good day. Charlie Darren R. Chase PSMFC Office :(509) 735-2773 Ext. 3 Cell: (509) 539-6786 02/10/2009 08:29 Alan Apparently, JCJ is up. JCJ09040.C1, JCJ09041.A1 and JCJ09041.B1 were pushed manually to PTAGIS via PCA. The temp folder was cleared, but I think the upload issues were probably due to a tenuous internet connection. PTAGIS Field Operations will continue to monitor. 01/01/2009 00:00 PTOC_Bot Annual log file initiation for JCJ #### End of Event Log for JCJ ###