EVENT LOG FOR SITE ESS The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 10/23/2013 08:46 Cameron1 The site ESS A0 ran out propane fuel on 9/20/13 resulting in an interruption in data collection. The propane tank was filled and normal operation resumed on 9/25/13. The site has been running continuously without disruption through 10/23/13. The site ESS B0 has been running continuously without disruption through 10/23/13 05/17/2013 09:23 Cameron ESS A0 The site stopped functioning on 3/11/13. The thermoelectric generator received maintenance on 3/15/13. The site was restored and operating again on 3/15/13. The site is functioning properly without disruption through May 17, 2013. ESS B0 The site is functioning properly without disruption through May 17, 2013. 01/02/2013 00:00 PTOC_Bot Annual log file initiation for ESS #### End of Event Log for ESS ###