EVENT LOG FOR SITE ESS Most recent activity to be listed first. First line of each entry lists date, time and who is reporting. Subsequent lines of each entry aligned under Time column. Do not use tabs, only spaces. Date Time Who What ---------- ----- -------- ----------------------------------------------- 08/17/2009 14:26 Rick ESS B0, approximately 1/4 mile below ESS A0, became operational on August 6, 2009. ESS B0 is identical to ESS A0 consisting of four 20 foot flat panel Biomark antennas. ESS A0 was non-functional for approximately 5 hours on August 13 while the power source was being changed. However, ESS B0 was operational during this time. -- ------------------------------------------------------------------------ Rick Orme Nez Perce Tribe Dept. Fisheries Resources 125 S. Mission St. PO Box 1942 McCall, ID 83638 Phn. 208.634.5290 Fax 208.634.4097 ------------------------------------------------------------------------ 08/17/2009 07:58 Rick ESS B0, approximately 1/4 mile below ESS A0, became operational on August 6, 2009. ESS B0 is identical to ESS A0 consisting of four 20 foot flat panel Biomark antennas. ESS A0 was non-functional for approximately 5 hours on August 13 while the power source was being changed. However, ESS B0 was operational during this time. -- ------------------------------------------------------------------------ Rick Orme Nez Perce Tribe Dept. Fisheries Resources 125 S. Mission St. PO Box 1942 McCall, ID 83638 Phn. 208.634.5290 Fax 208.634.4097 ------------------------------------------------------------------------ 05/08/2009 08:40 Rick The ESS A0 array continue to operate normally. Currently high flows allows for fish passage around each end of each array. In addition, high water also increase the volume of water above the array that is beyond the detection limits of the antennas. The site is equipped with satellite communications for remote downloading of detections and status reports. The site recently was equipped with a temperature sensor, enabling real time monitoring of stream temperatures. -- ------------------------------------------------------------------------ Rick Orme Nez Perce Tribe Dept. Fisheries Resources 125 S. Mission St. PO Box 1942 McCall, ID 83638 Phn. 208.634.5290 Fax 208.634.4097 ------------------------------------------------------------------------ 04/16/2009 05:37 Anglea,_ The ESS A0 site(upstream) was installed during the week of March 23, 2009. The site consists of 4-20 ft Biomark pass-by antennas. Monitoring began at approximately noon on March 26, 2009. The ESS B0 site (downstream) is scheduled to be installed in August 2009. 03/18/2009 12:35 Dave Initial Event Log entry for ESS. Jason Vogel is the Site Coordinator and Rick Orme is the primary Point of Contact. ####End of Event Log for ESS###