EVENT LOG FOR SITE CHP The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 05/14/2010 10:45 Brett Information pertaining to the volitional release of spring chinook from CHP in 2010: The chinook were initially raised at Eastbank hatchery near East Wenatchee and transferred to the Chiwawa ponds on December 14-16, 2009. The volitional release started on 4/14/10 at 10:59 am. That is the point in which the PIT tag equipment was installed and running, and when the hatchery personnel opened the gate. On 5/12/10, hatchery personnel seined the remaining fish out of the pond. During this seining process, several hundred (?) fish escaped over the dam boards without going through the PIT tag antennas. Also, pushing thousand fish through the PIT tag system in a short period of time probably also adversely impacted the ability to read some of the PIT tagged fish. The volitional release officially ended at 10:00 am PST on 5/12/10. The fish were gone from the pond, and the PIT tag equipment was turned off and uninstalled. 05/14/2010 10:27 Brett The volitional release ended on 5/12/10 at 10:00 am PST. 04/21/2010 07:12 Brett Collected the data files for the first 7 days of operation. 04/14/2010 18:12 Brett CHP was installed and the volitional release started at 10:59 a.m. PST on 4/14/10. 01/01/2010 00:00 PTOC_Bot Annual log file initiation for CHP #### End of Event Log for CHP ###