EVENT LOG FOR SITE ACB Most recent activity to be listed first. First line of each entry lists date, time and who is reporting. Subsequent lines of each entry aligned under Time column. Do not use tabs, only spaces. Date Time Who What ---------- ----- -------- ----------------------------------------------- 12/05/2011 11:52 Reid ACB was connected to a modem on 8/20/11. Data is now uploaded daily to PTAGIS. Data from 8/13/11 to 8/20/11 was accidentally deleted while hooking up ACB to the modem. 08/24/2011 11:20 Reid Even though there are data gaps in the submitted files for ACB between 1/1/2011 and 8/13/2011, the sites were operating continuously, 24 hours a day. The gaps are from mistakes in the uploading process. 08/15/2011 08:05 Reid Site Operations Normal 07/29/2011 13:00 Reid Site Operations Normal 07/17/2011 11:20 Reid Antennas 4 and 5 have no flow over them. Site Operations Normal 07/04/2011 20:34 Reid Antennas 4 and 5 are no longer under water Site Conditions Normal 06/19/2011 09:58 Reid Antennas 4 and 5 are under about 5cm of water with little flow. Site Operations Normal 05/23/2011 20:37 Reid 05/23/2011 11:00 Camp Water is still high. Antennas 4 and 5 are still under about one foot of water. All antennas are working. 05/16/2011 20:39 Reid Date Time Who ---------- ----- -------- 05/16/2011 17:00 Camp Water appears to have peaked at ~350cfs at the site according to DOE's gauge. Antennas 4 and 5 have about one foot of water over them. All Antennas are working. 05/11/2011 13:55 Camp Water is high. Water is covering Antennas 4 and 5 but there is little flow over them. Site Operations Normal 05/04/2011 12:45 Camp Site Operations Normal 04/23/2011 13:20 Camp Site Operations Normal 04/10/2011 11:30 Camp Water height has dropped. Antennas 4 and 5 are partially under water, but with very little flow. Otherwise Site Operations Normal 04/03/2011 11:35 Camp Water is very high. Antennas 4 and 5 are under water. Asotin Creek is running at about 220cfs at the site. Otherwise Site Operations Normal 03/27/2011 11:35 Camp Site Operations Normal 03/13/2011 12:00 Camp Site Operations Normal 03/03/2011 12:20 Camp Site Operations Normal 02/21/2011 10:20 Camp Site Operations Normal 02/10/2011 12:55 Camp Site Operations Normal 02/02/2011 13:20 Camp Began firing and storing test tags every 6 hours at all antennas. Test tag at ACB is 3E7.0000001D00 Otherwise site operations Normal 01/20/2011 12:50 Camp Noise was a little high. All antennas were manually tuned. 01/13/2011 13:55 Camp Site Operations Normal 01/04/2011 11:20 Camp Site Operations Normal 04/05/2011 15:10 Nicole Initial entry for the new ACB (Asotin Creek at Cloverland Bridge ISA) SRSRB site. Steve Martin (steve@snakeriverboard.org) is the Site Data Steward; Steve Bennett (Bennett.ecological@gmail.com) is the Technical POC. ####End of Event Log for ACB###